Project Cost: $21,500,000
Total Roof project at the High School: Masonry restoration to all four buildings; Asbestos Abatement and re-building 20 classrooms at the elementary school; Parking lot renovation at three of the buildings and site work through the district.
Tidewater Healthcare Facility
inproduction
Project consisted of a 4-story 40,000 square foot Medical Office Building with offices; controlled central computer space; laboratories; X-ray facility; conference area and central billing area.
Sentara Life Care 60 / 120
inproduction
Project Cost: $8,000,000
Simultaneous construction of a 60-bed fully equipped assisted living facility and a 120-bed Nursing facility on same property; with Doctor’s offices; nursing stations; emergency care area; medical gases; kitchen and laundry facility.
Marcellus Central Schools
inproduction
Project Cost: $22,900,000
Project encompassed building new bus garage with offices, mechanics bay and bus wash bay. Driver Middle School 10 classroom addition with a new gym and elevated indoor running track, new stadium with an artificial turf field with eight lane running track, lights bleachers, and press box. Interior renovations to existing school buildings, asbestos abatement of floor tiles, ceiling tiles and pipe insulation. The construction of a new concession stand/storage building for the stadium, new roads and parking lots.
Camden Potomac Yard
inproduction
Project Cost: $110,000,000
Developed and built a 378 unit Class A High Rise apartment complex in down town Washington D.C. Project also included a Clubhouse, Amenities and Retail space
Willowfield Athletic Fields Liverpool Central Schools
inproduction
Project Cost: $560,000
Supervision of two competition softball fields, one competition soccer field and two soccer practice fields, underground water systems and preparation for the second phase of the project
15 Building Installation - Liverpool Central School District
inproduction
Project Cost: $1,680,000
Supervision of Fiber Optics, Security system and partial phone system installation throughout the fifteen buildings of the school system. These systems are all-inclusive and are piggybacked on the fiber optics
Soule Road Complex Liverpool Central Schools
inproduction
Project Cost: $14,800,000
Five new additions and a total renovation to the existing building including new heating and air conditioning systems
Federal Credit Union Liverpool Central Schools
inproduction
Project Cost: $1,200,000
Ground up project from design stage through project completion. We hired the Architectural and Engineering Firms, worked with them on the design, hired the contractors and did the entire close out.
Western Regional Off-track Betting Corporation, Auburn
inproduction
Project Cost: $1,750,000
Due to the General Contractor’s financial problems, Construction Associates took over the total project, scheduling the three other prime contractors, and the sub-contractors of the G.C. the contract was completed on time and with in budget
Western Regional Off-Track Betting Corporation, Phoenix, NY
inproduction
Project Cost: $2,000,000
Ground up construction project for OTB Phoenix, NY. The project was completed on time and within budget. Demonstrated strength in dealing with local government agencies in order to obtain domestic water and fire hydrant lines at no additional cost to the project. This resulted in a savings of $120,000.
Reward
The price of success: dedication, hard work, and a devotion to the things you want to see happen.