Construction Manager

Project Portfolio

Mount Markham Central Schools

offline

Project Cost: $21,500,000 Total Roof project at the High School: Masonry restoration to all four buildings; Asbestos Abatement and re-building 20 classrooms at the elementary school; Parking lot renovation at three of the buildings and site work through the district.

Tidewater Healthcare Facility

inproduction

Project consisted of a 4-story 40,000 square foot Medical Office Building with offices; controlled central computer space; laboratories; X-ray facility; conference area and central billing area.

Sentara Life Care 60 / 120

inproduction

Project Cost: $8,000,000 Simultaneous construction of a 60-bed fully equipped assisted living facility and a 120-bed Nursing facility on same property; with Doctor’s offices; nursing stations; emergency care area; medical gases; kitchen and laundry facility.

Marcellus Central Schools

inproduction

Project Cost: $22,900,000 Project encompassed building new bus garage with offices, mechanics bay and bus wash bay. Driver Middle School 10 classroom addition with a new gym and elevated indoor running track, new stadium with an artificial turf field with eight lane running track, lights bleachers, and press box. Interior renovations to existing school buildings, asbestos abatement of floor tiles, ceiling tiles and pipe insulation. The construction of a new concession stand/storage building for the stadium, new roads and parking lots.

Camden Potomac Yard

inproduction

Project Cost: $110,000,000 Developed and built a 378 unit Class A High Rise apartment complex in down town Washington D.C. Project also included a Clubhouse, Amenities and Retail space

Willowfield Athletic Fields Liverpool Central Schools

inproduction

Project Cost: $560,000 Supervision of two competition softball fields, one competition soccer field and two soccer practice fields, underground water systems and preparation for the second phase of the project

15 Building Installation - Liverpool Central School District

inproduction

Project Cost: $1,680,000 Supervision of Fiber Optics, Security system and partial phone system installation throughout the fifteen buildings of the school system. These systems are all-inclusive and are piggybacked on the fiber optics

Soule Road Complex Liverpool Central Schools

inproduction

Project Cost: $14,800,000 Five new additions and a total renovation to the existing building including new heating and air conditioning systems

Federal Credit Union Liverpool Central Schools

inproduction

Project Cost: $1,200,000 Ground up project from design stage through project completion. We hired the Architectural and Engineering Firms, worked with them on the design, hired the contractors and did the entire close out.

Western Regional Off-track Betting Corporation, Auburn

inproduction

Project Cost: $1,750,000 Due to the General Contractor’s financial problems, Construction Associates took over the total project, scheduling the three other prime contractors, and the sub-contractors of the G.C. the contract was completed on time and with in budget

Western Regional Off-Track Betting Corporation, Phoenix, NY

inproduction

Project Cost: $2,000,000 Ground up construction project for OTB Phoenix, NY. The project was completed on time and within budget. Demonstrated strength in dealing with local government agencies in order to obtain domestic water and fire hydrant lines at no additional cost to the project. This resulted in a savings of $120,000.

Reward

The price of success: dedication, hard work, and a devotion to the things you want to see happen.

-Frank Llyod Wright